Commercial & Industrial Construction • Permian Basin & West Texas • Mon to Fri 8AM to 6PM • (432) 279-0113

Commercial Metal Building Contractors in Midland, TX

Commercial metal buildings and steel commercial buildings for businesses across the Permian Basin, from the site work and foundation through the steel, the envelope, and the finish, carried by one contractor with full liability.

Site & FoundationGroundwork and foundation self-performed by Apex
Steel ErectionFrame and envelope set on the foundation Apex poured
Engineering CoordinationBuilding and foundation engineering aligned up front
Full LiabilityOne contractor accountable from dirt to finish
Commercial Metal Buildings

Steel goes up fast. The foundation decides if it stays square.

A metal building arrives engineered to its loads, but it only performs if the anchor bolts, the foundation, and the slab under it are right. Many problems on a commercial metal building trace back to a foundation poured by one contractor and steel erected by another, with nobody owning the gap between them.

Apex carries both. As a steel building general contractor, Apex takes the site, the foundation, the steel erection, and the finish as one scope under one contract with full liability, coordinated with engineering from the start. It is the same approach Apex brings to its commercial and industrial work across West Texas.

What It Covers

The full commercial metal building.

From raw ground to a commercial steel building your business can move into.

01

Site Work & Foundation

Clearing, grading, and the foundation and slab the building is anchored to, self-performed by Apex.

02

Steel Frame & Erection

The primary and secondary steel frame of the commercial building, set and erected on the foundation plumb and square.

03

Roof & Wall Envelope

Roof and wall panels, insulation, doors, and openings that close the building in.

04

Interior Buildout

Offices, restrooms, and interior finish inside the metal building, coordinated as part of the same contract.

How It Goes

How commercial metal building construction works.

1

Scope & Engineering

The building’s use, size, and loads are confirmed and the building and foundation engineering are coordinated before steel is ordered.

2

Site & Foundation

Apex prepares the site and pours the foundation with anchor bolts set to the building drawings.

3

Erect & Close In

The steel frame is erected and the roof and wall envelope go on to close the building in.

4

Finish & Handover

Doors, interior work, and finish are completed and the building is handed over ready to occupy.

Explore More

Related construction services.

Commercial metal buildings share scope with the rest of the Apex build.

Warehouse Construction

Warehouses and distribution space built start to finish.

Metal Shops

Working shops and service bays for businesses and operations.

Slab Foundations

The foundation and slab every building stands on.

Commercial Construction

The full commercial scope Apex carries under one contract.

Common Questions

Frequently asked questions

Does Apex build commercial metal buildings in Midland?
Yes. Apex is a commercial metal building contractor based in Midland, TX, building across the Permian Basin and West Texas. Apex handles the site work, foundation, steel erection, envelope, and finish under one contract with full liability.
Does Apex pour the foundation for the metal building?
Yes. Apex self-performs site work and concrete, so the foundation and slab are poured by the same contractor that erects the steel. Anchor bolts are set to the building drawings, which closes the most common gap between foundation and erection crews.
What can a commercial metal building be used for?
Common uses include warehouses, retail and office space, service and maintenance buildings, and storage for businesses and operations. The building is engineered for its use, loads, and site, and the layout is confirmed in the bid.
Can Apex finish out the inside of the building?
Interior buildout such as offices, restrooms, and finish work can be carried under the same contract, so one party is accountable for the building inside and out. The interior scope is confirmed per project.
Does Apex work with the building engineer?
Yes. Apex coordinates the metal building engineering and the foundation design from the start, drawing on its partnerships with engineering firms, so the foundation, anchor bolts, and steel are aligned before anything is poured or erected.
How much does a commercial metal building cost per square foot?
Cost per square foot depends on the building size and height, the loads it is engineered for, the foundation and site work, doors and openings, insulation, and any interior buildout. Apex does not publish set prices. Tell us what the building is for and where it will go, and you will get a bid with the full scope spelled out.

Planning a commercial metal building?

Tell us what the building is for and where it will go. You will get a straight answer on scope and how Apex would take it from foundation to finished building.


Call us +14322790113